Shuksan Middle School
- Location: Bellingham, WA
- Client: Bellingham School District
- Size: 82,000 SF
The New Shuksan Middle School completed construction just in time for the 2009 school year. The new building was constructed on the same site as the existing school, built in 1954. This was done to allow the students to remain on-site with minimal disruptions and transitional costs. The new school also acts as a community center for an area of Bellingham that is lacking in this type of amenity. This two-story building is divided into shared public/community use areas such as the library, commons, kitchen and gymnasium, while the educational areas are separated allowing for easier evening access and keeping the remainder of the building secure. HVAC and lighting systems are separately controlled in these areas to minimize energy costs.
Projects in Educational
-
Sumas Elementary School
-
Parkview Elementary
-
Nooksack Valley Middle Addition
-
Nooksack High School Renovation
-
Bellingham SD Bus Facility
-
Blaine High School
-
Options High School
-
Fisher Elementary School
-
Meridian High School
-
Irene Reither Elementary School
-
Wade King Elementary
-
Kulshan Middle School
-
Northern Heights Elementary
-
WCC Health Professions Ed Center
-
WCC Auxiliary Services
-
WCC Kelly Building
-
WWU Multi-Purpose Field
-
WWU Campus Services
-
Northwest Indian College Library
-
Northwest Indian College Salish Sea Science Research Facility